The four private sector participants are Iwatani Corp., Toshiba Corp., Toyota Motor Corp., and Toyota Turbine and Systems Inc.
On the public sector side, the project is being implemented by the Kanagawa Prefectural Government, Yokohama City, and Kawasaki City. In addition, the project will be supported by Japan's Ministry of the Environment.
Under this trial project, wind power will be used to turn water into oxygen and hydrogen, with the latter stored for use locally. Grid power will only be used for backup when absolutely necessary and excess renewable energy produced may even be sold to utility companies.
As plans currently stand, the project will involve
- A system to produce hydrogen by electrolyzing water using wind power
- A system to optimize storage and transportation of hydrogen produced
- Use of fuel cell forklifts
- A hydrogen supply chain feasibility study (hydrogen price, CO2 reduction, etc.)
The total project duration is expected to take place over four years. At this stage, the project partners are still discussing specifics. Implementation is set to begin from April 2016 onward.