COSCO Shipping Panama set sail June 11 from the Greek Port of Piraeus carrying 9,472 TEUs and measuring 299.98 meters in length and 48.25 meters in beam. Later this afternoon, the vessel will reach the Pacific-facing Cocoli Locks where the official Inauguration ceremony will take place.
The Expansion Program is the Canal’s largest enhancement project. It included the construction of a new set of locks on the Atlantic and Pacific side of the waterway and the excavation of more than 150 million cubic meters of material, creating a second lane of traffic and doubling the cargo capacity of the waterway.
While the Expanded locks are 70 feet wider and 18 feet deeper than those in the original Canal, they use less water due to water-savings basins that recycle 60 percent of the water used per transit.
Considered and analyzed for a decade with more than 100 studies, the Expansion will provide greater economies of scale to global commerce. It will introduce new routes, liner services, and segments (such as liquefied natural gas).